Technical Workforce Solution

Certified Service
Sub-Contractor

Providing certified and experienced professionals, ready to support your projects and technical service requirements with reliable and professional workforce solutions.

CSS

Certified Technical Workforce.
Ready When You Need It.

Flexible technical workforce support designed for companies that need qualified professionals without the complexity of long-term recruitment.

WORKING ORDER BASED

Technical Workforce Challenges

Project requirements can change quickly, making it difficult to maintain the right technical resources at the right time.

01

Finding Ready-to-Deploy Experts

Difficulty finding experienced technical professionals who are ready to be deployed when projects require them.

02

Time-Consuming Recruitment

Recruitment processes can require significant time and resources before technical personnel are available.

03

Inconsistent Resource Quality

Maintaining consistent technical capability and workforce quality can become challenging across different projects.

04

Flexible Workforce Needs

Project-based requirements often require workforce resources that can scale according to operational needs.

The Right Technical Workforce for Your Project

Certified Service Sub-Contractor provides professional technical workforce based on Working Orders, helping companies access qualified resources according to project requirements.

01

Certified Professionals

Access certified and experienced technical professionals for specific project needs.

02

Fast Deployment

Technical resources can be deployed based on your Working Order requirements.

03

Flexible Workforce

Workforce support can be adjusted according to project and operational requirements.

04

Scalable Resources

Scale technical workforce resources according to changing project requirements.

Our Capability

Certified Technical Professionals

01

HVAC Engineer

Skills

Load Calculation, Ducting, AHU, AutoCAD

02

Cooling Engineer

Skills

Cooling System, Chiller, Maintenance

03

UPS Engineer

Skills

UPS Installation, Electrical, Troubleshooting

Technical Support That Adapts to Your Project

Our Certified Service Sub-Contractor solution is structured around Working Orders, allowing technical workforce requirements to be aligned with specific project needs.

Project Case Study

Real Project Experience.
Reliable Technical Support.

Industry Facility & Infrastructure Support
Client Client
Location Balikpapan, Indonesia
Project Period August 12–13, 2026

Project Overview

Pro Worker Customer Support Services team supported a scheduled preventive maintenance project involving eight Schneider Electric Uniflair InRow Cooling units at a customer facility in Balikpapan. The project focused on maintaining precision cooling performance, supporting operational reliability, and identifying potential technical issues through systematic inspection, equipment cleaning, and component replacement.

!

Client Challenges

Maintaining precision cooling infrastructure requires consistent preventive maintenance and timely technical intervention. During inspection, potential refrigerant leakage indicators were identified on InRow Units 2 and 4, while SELPRO fan speed controllers on Units 4, 7, and 8 required replacement. An unplugged alarm indication was also found on Unit 7, alongside the routine maintenance requirements for all eight cooling units.

✓

Pro Worker Solution

Pro Worker supplied a Cooling Engineer to execute preventive maintenance and technical support across all eight units. Activities included cleaning air filters, condenser units, drain pans, and float switches; testing drain pump functionality; resetting filter operating hours; replacing three SELPRO fan speed controllers; inspecting the alarm indication; and recording equipment parameters. Follow-up monitoring and on-site service reporting were also conducted to document the maintenance activities and technical findings.

⚙
Professional Engineer Supplied Cooling Engineer
TECHNICAL SUPPORT

Project Results & Achievements

08
Cooling Units Preventive maintenance completed
03
Controllers Replaced Successfully replaced and tested

Key Project Deliverables

  • Preventive maintenance completed across all eight cooling units.
  • Three SELPRO fan speed controllers successfully replaced and tested.
  • Drain pump functionality tested and confirmed operational.
  • Potential refrigerant leakage indicators documented for further assessment.
  • Equipment operating parameters recorded and follow-up monitoring conducted.
  • On-site service report prepared to document work and technical findings.

Need Certified Technical Workforce?

Let Pro Worker support your project with certified and experienced technical professionals based on your workforce requirements.

Contact Us